Diagnostic Visit
22/04/2026 2026-04-22 9:50Diagnostic Visit
Comprehensive Report Editor
1. Basic Info & Cover
2. Performance Metrics
3. Written Analysis
REPORT SERIAL
KTH-DIA-2024-001
Technical
Diagnosis
Report
PREPARED FOR
Al-Wataniya Manufacturing Co.
DATE
April 24, 2024
LOCATION
Riyadh, KSA
KTH Industrial ConsultingConfidential Document
Structure
01. Contact Information03
02. Attendance Record03
03. Management Hearing & Overview04
04. On-Site Technical Observations05
05. Quantitative Data Collection06
06. Preliminary Findings & Analysis07
07. Technical Proposal & Roadmap08
The objective of this assessment is to identify technical gaps, measure operational KPIs including OEE and LBE, and provide a strategic roadmap for manufacturing excellence through KTH industrial expertise.
Table of ContentsPage 02
01 Contact Details
| Entity Name | Al-Wataniya Manufacturing Co. |
|---|---|
| Principal Contact | Eng. Abdullah Al-Sudairy |
| Designation | Operations Director |
| Site Address | Second Industrial City, Riyadh |
02. Official Attendance
| Name | Role | Org |
|---|---|---|
| Abdullah Al-Sudairy | Ops Director | Client |
| Khalid Mansour | Plant Manager | Client |
| Dr. Robert Smith | Senior Consultant | KTH |
Contact & AttendancePage 03
04 On-Site Observations
• PRODUCTION FLOW: Observed a linear flow in Line A. • EQUIPMENT STATE: 40% of the machinery is over 10 years old. • BOTTLENECKS: Manual labeling creates a 12-minute buffer delay. • MAINTENANCE: Records show a reactive maintenance culture.
Facility AssessmentPage 05
05 Data Collection
62.4%
78.0%
4.2%
2.4h
| Line | Actual | Design | Util % |
|---|---|---|---|
| Extrusion | 850 kg/h | 1,200 kg/h | 71% |
| Injection | 1,400 u/h | 1,500 u/h | 93% |
| Assembly | 3,200 u/h | 5,000 u/h | 64% |
KPI AnalysisPage 06
07. Technical Proposal
PHASE I: 5S implementation in the warehouse. PHASE II: Deployment of a Preventive Maintenance schedule. PHASE III: Full integration of OEE monitoring software.
KTH CONSULTANT
CLIENT APPROVAL
Proposal & RoadmapPage 08